Hi,
I’ve observed an incorrect date display in the Tree Engine in my own workspace, but couldn’t understand the cause. After setting up a dedicated test workspace, I can consistently reproduce the same issue. I’m wondering if this is a modeling mistake on my part, or potentially a bug in the engine.
Setup:
- There is an n-m relationship between
LocationandEmployeewith link fieldsStartDateandEndDate. - In the (SelectedItems) Overview Engine, both dates are shown correctly.
- In the Tree Engine, however, both
StartDateandEndDateare displayed with the same value, even though the uploaded test document contains two distinct dates. - I verified that the values in the database and in the server response are correct – it’s only the UI display in the Tree Engine that’s wrong.



I’ve created a test workspace but can’t upload it because it’s a zip file. I’d appreciate it if someone experienced with this topic could take a look and let me know whether this is a modeling issue or a bug, and how to resolve it. I can send the zip file via WebEx.
Thanks in advance!
Foued